Factory Moving Company in Bangladesh


Factory Moving Company in Bangladesh – A Comprehensive Guide

Relocating a factory involves much more than just moving boxes. For businesses in Bangladesh, hiring a professional factory moving company can make a big difference. In this article, we will cover multiple aspects of factory relocation in Bangladesh including services offered, benefits, a price table (BDT), tips for hiring the right company, skilled workers and equipment used, and a detailed FAQ section. The goal is to give you all the information you need to plan a smooth factory move.


1. What Services Does a Factory Moving Company Provide?

When you engage a factory moving specialist in Bangladesh, you should expect a suite of services tailored to industrial-scale relocation. These include:

• Pre-move planning & site survey

  • Surveying the existing factory site: inventory of machines, layout, utilities.
  • Surveying the new site: access, floor strength, clearance, transportation routes.
  • Planning the move: timeline, production downtime, sequence of disassembly.
  • Risk assessment: safety issues, heavy equipment, traffic, permits.

    • Dismantling, packing & transportation

    • Dismantling heavy machinery: conveyor belts, assembly lines, large machines.
    • Proper packing of machinery: shock-proofing, protection from corrosion and dust.
    • Transportation: choosing appropriate trucks/trailers, route planning, loading & unloading.
    • Secure transit: ensuring machines are stable during transport.

      • Re-installation, testing & commissioning

      • Installing machinery at the new site: alignment, levelling, anchoring.
      • Re-connecting utilities: power, air, water, pneumatics, control systems.
      • Testing & commissioning: ensuring machines work correctly, operators are trained.
      • Clean-up & disposal: removing old equipment, packaging, leftover debris.

        • Specialized services

        • Heavy haulage and crane services for exceptionally large machines.
        • Temporary storage if the new site is not ready.
        • Insurance coverage for high-value equipment.
        • Project management: coordinating all teams, timelines, logistics.

          In Bangladesh, several moving companies mention having “machinery shifting services” and “factory/industrial relocation” in their offerings. For example, one company states: “Heavy machinery and equipment moving … safe and efficient factory relocation with minimal downtime.” (moversbd.com) Also “industry shifting service” sites highlight use of advanced equipment and risk management. (packnshift.com.bd)


          2. Benefits of Hiring a Professional Factory Moving Company

          Relocating a factory is a major endeavour. Hiring a professional company gives you many advantages:

          • Minimised downtime: When production lines need to be moved, every hour of downtime is lost revenue. A professional mover plans to minimise disruption.
          • Safety & risk mitigation: Heavy machinery, utilities and structural modifications pose risks. Professionals have the right equipment and trained crew to manage them.
          • Specialist equipment & know-how: They bring cranes, trailers, packing gear and understand how to move large industrial assets.
          • Proper handling of machinery: From dismantling to re-installation, machines get handled in a way that preserves alignment, calibration and integrity.
          • Comprehensive service: You get everything — planning, execution, transport, installation — under one contract. That reduces coordination burden.
          • Insurance & accountability: Reputable movers provide insurance for equipment during transit/installation.
          • Compliance and logistics: They manage permits, route clearances, utilities shut-down/turn-on, and ensure smoother legal/operational process.

            These benefits matter especially in the Bangladeshi industrial context where logistics, road access, utility reliability and downtime have serious cost implications.


            3. Bangladesh Price Table – Factory Relocation (Indicative)

            Below is a sample pricing table for factory relocation in Bangladesh. These are indicative figures. Actual cost will vary depending on size of factory, number of machines, distance, site conditions etc. Sources show ranges for industrial moves in Bangladesh. (packnshift.com)

            Move Type Estimated Cost (BDT) Notes
            Small factory move (light equipment, local city move) ৳ 50,000 – 100,000 Minimal heavy machines, short distance.
            Medium factory move (moderate machinery, moderate distance) ৳ 100,000 – 150,000 More machines, some heavy handling.
            Large factory move (many heavy machines, long distance or remote site) ৳ 150,000 – 300,000+ Large scale, complex logistics, high risk.
            Installation & commissioning services ৳ 50,000 – 200,000+ Depending on complexity of setup.
            Insurance, specialised heavy haulage, storage Project dependent Extra services beyond moving.

            Note: Some sources for Dhaka industrial moves list BDT 80,000 – 300,000 for “industrial move” category. (packnshift.com)

            Before engaging a mover, it’s wise to get detailed quotes from 2–3 firms that break down costs (labour, transport, equipment, insurance) to compare.


            4. Skilled Workers & Equipment – What to Look For

            One of the key differentiators of a quality service is having the right team and equipment.

            Skilled Workers

            • Project manager: oversees entire move, scheduling, coordination.
            • Machinery technicians: understand disassembly/reassembly of production equipment.
            • Heavy‐lifting crew: trained in using cranes, jacks, chains, rigging.
            • Transportation specialists: drivers, loading/unloading supervisors.
            • Installation and commissioning crew: aligning machines, testing, calibration.
            • Safety officers: ensure compliance with safety rules, minimise accidents.

              Equipment & Tools

              • Cranes (mobile or stationary) capable of handling heavy loads.
              • Forklifts, tele-handlers for moving pallets or machines.
              • Hydraulic jacks, skid-steer equipment, rollers for machine movement.
              • Heavy haulage trailers/trucks designed for large loads and oversize cargo.
              • High-quality packing materials: shock-absorbent mats, wooden crates, moisture-proof covers.
              • Rigging equipment: chains, slings, shackles rated for load.
              • Alignment and levelling tools for machine installation.
              • GPS tracking, route planning software for transportation logistics.
              • Permits and compliance tools (for oversize loads, road closures).

                In Bangladesh, industrial relocation service descriptions emphasize “handling diverse and heavy machinery”, “specialized equipment” and “minimizing downtime”.


                5. Tips for Hiring the Right Factory Moving Company

                Choosing the correct moving partner is crucial. Here are key steps and tips:

                1. Check experience in industrial/factory moves: Ask for case studies of previous factory or heavy-machinery relocations, not just home/office moves.

                2. Site survey & detailed quote: The company should visit the site, inspect machines, route, site conditions and provide a detailed breakdown of cost and timeline.

                3. Transparency in pricing: Make sure all components (labour, transport, packing, installation, insurance) are clearly stated. Beware of hidden costs.

                4. Credentials & insurance: Company should carry relevant licences, worker safety credentials, and offer insurance for equipment.

                5. Equipment and manpower availability: Confirm they have the required cranes, trucks, rigging gear and trained crew for your size of factory.

                6. Downtime minimisation plan: Discuss how they will plan to minimise production stoppage, what contingency plans exist.

                7. Installation and commissioning support: It’s not enough to move machines — getting them running at new site is essential. Does the mover provide or coordinate this?

                8. References & reviews: Ask for client references and check testimonials or reviews of their past industrial moves.

                9. Contract & timeline: A clear agreement with deliverables, timeline, responsibilities, liabilities.

                10. Compliance & logistics management: For Bangladesh, road conditions, site clearance, utility connections, local permits matter. Ensure the mover handles these.

                Following these tips will reduce risk, cost overruns and delays.


                6. Frequently Asked Questions (FAQ)

                Q1: “How long will the factory relocation take?”

                A: Duration depends on scale. Smaller factory moves may take a few days; large ones might stretch into weeks. It depends on equipment volume, dismantling time, transport distance and re-installation. A precise timeline should be provided by the moving company.

                Q2: “Will production stop during the move?”

                A: Usually yes, at least partially. The goal is to minimise downtime. Professional movers will plan phasing so critical machines remain operational as long as possible, then relocated with minimal disruption.

                Q3: “What factors affect the cost most?”

                A: Some major cost drivers:

                • Size & weight of machinery
                • Distance between sites
                • Site access (narrow roads, overhead obstacles)
                • Need for cranes/heavy-haulage
                • Complexity of installation at new site
                • Permit, route, and logistic challenges
                • Storage needs before or after move

                  Q4: “Is insurance essential?”

                  A: Absolutely. Heavy machinery is high-value. Transit, lifting, re-installation pose risks. Ensure the moving company offers insurance or you arrange your own coverage.

                  Q5: “Can we just rent transport & do the rest ourselves?”

                  A: Technically yes, but risky. Dismantling, packing, moving heavy machines requires specialist expertise and equipment. Mistakes can cause damage, misalignment, prolonged downtime, or safety hazards.

                  Q6: “How much advance planning is needed?”

                  A: For factory relocation, planning at least 4-6 weeks in advance is advisable. For large scale moves, 2-3 months may be better. Early planning allows for route surveys, machine inventory, scheduling, and contingency planning.

                  Q7: “What about temporary storage?”

                  A: Good moving companies offer storage solutions if your new site isn’t immediately ready. Storage cost should be factored into the budget and handled under secure conditions.

                  Q8: “How to reduce the cost of relocation?”

                  A: Some cost-saving tips:

                  • Declutter: scrap or sell outdated machines before moving.
                  • Move during off-peak time (less traffic, better rates).
                  • Use local route and site rather than long-distance if possible.
                  • Coordinate machine installation so minimal adjustments needed.
                  • Compare 2-3 quotes and negotiate transparency.

                    7. Summary / Conclusion

                    Relocating a factory is a large, complex project. In Bangladesh, if you are searching for a factory moving company, you must consider service range, benefits, cost structure, skilled workers and equipment, and how to choose the right partner. Paying attention to these factors helps ensure your move is smooth, timely and cost-effective.

                    Remember the key take-aways:

                    • Choose a company experienced in industrial relocation, not just home moves.
                    • Ensure detailed planning, minimise downtime, and account for special equipment and transport requirements.
                    • Get transparent pricing, understand variables that affect cost.
                    • Confirm skilled workforce and the right tools are in place.
                    • Use the FAQ as a checklist for key concerns.

                      With proper preparation and the right mover, you can relocate your factory with confidence and less stress.

                      If you like, I can help you identify top 5 factory moving companies in Bangladesh, compare their services, and highlight their typical rates so you can benchmark your project. Would you like that?

                      01408009001
                      01408009001